AOG? Call or text (201) 452-1986
Message Us
NEW: Contract Maintenance for Part 135 Operators
Topgun Maintenance

Projects & Gallery

Some of the work, shown for reference. Sheet metal, composite, and structural repairs with approved data, returned to service by an A&P/IA.

Recent Projects

Some maintenance shown for reference.

Cirrus SR22 in the Owner's Hangar
2026
Mobile Service
Cirrus SR22
Maintenance performed on site.
Wing Tip Skin Replacement
2025
Sheet Metal
Wing Tip Skin Replacement
Old skin drilled out, new skin fitted and clecoed, then riveted and sealed.
Vertical Fin Cap Fit Check
2025
Sheet Metal
Vertical Fin Cap Fit Check
Skin trimmed and clecoed for fit before final rivets.
Fairing Rivet Removal
2025
Sheet Metal
Fairing Rivet Removal
Rivets drilled clean without enlarging the holes, ready for the new part.
Composite Damage Repair
2024
Composite
Composite Damage Repair
Damage opened up, layup scheduled, cured under heat lamp, faired and painted.
Skin Fairing Assembly Drill Out
2024
Structural
Skin Fairing Assembly Drill Out
Fastener removal on a skin fairing assembly for replacement.
Wing Root Fairing, Fabricated and Fitted
2019
Fabrication
Wing Root Fairing, Fabricated and Fitted
Formed, drilled, and riveted to match the original contour.
Fairing Structure Replacement
2019
Structural
Fairing Structure Replacement
New structure clecoed in place before final riveting.

Sheet metal, composite, and structural repairs performed with approved data and returned to service by an A&P/IA. Ask us about your repair.